Group 3670 — Wells, Earth Boring/Moving/Working, Excavating, Mining, Harvesters, Bridges, Roads, Petroleum, Closures, Connections, and Hardware

Art Units in Group 3670

Art Unit Description 3YGR
3671 Road structure, process, or apparatus 83%
3672 Wells 85%
3673 Rotary kinetic fluid motors or pumps 69%
3674 Wells 84%
3675 Closure fasteners 75%
3676 Wells 79%
3677 Expanded, threaded, driven, headed, tool-deformed, or locked-threaded fastener 76%
3678 Hydraulic and earth engineering 79%
3679 Pipe joints or couplings 74%

Histogram of Examiner Grant Rates

Below is a weighted histogram (by number of cases) of the 3-year grant rates of the examiners in Group 3670. The average is 79% and the standard deviation is 12%.

Loading...

Comparison with TC 3600

Group 3670's grant rate is higher than that of TC 3600 and higher than that of the USPTO.

Loading...

Grant Rate Timeline

Below is the grant rate timeline for Group 3670, where the timeline is relative to the date of the first office action. The three-year grant rate is the percentage of applications granted at three years after the first office action.

Loading...

Disclaimer: We do not provide any guarantees as to the accuracy of the statistics presented above and under
no circumstances will we be liable for any outcome resulting from your reliance on the above statistics.

Loading...